Snohomish County replaced a failing 24-inch drainage pipe that crosses 156th St SE in the 8500 block. The new pipe is 36 inches to accommodate a higher capacity.
Construction took place in August, 2022 and lasted about two weeks.
This project required a two-week full-road closure. See map for detour route.
This project cost $76,000, funded by Surface Water Management Utility fees.
Existing drain pipe.
Project Manager
Ph: 425-262-2598
3000 Rockefeller Ave., M/S 303
Everett, WA 98201
Email Surface Water Management Division
Ph: 425-388-3464
Project #RR48673
Construction schedules are subject to change based on many factors that include: public safety; availability of funding, staffing, equipment and materials; right of way issues; permitting requirements; coordination with utilities and other agencies; soil conditions under roadway and seasonal changes.