Snohomish County replaced a culvert under 184th Pl SE, in the Bothell area. The pre-existing culvert was deemed a fish-passage barrier. The new arch culvert is designed to meet fish passage standards.
Construction took place from June through August 2022.
This project required a 24/7 full-road closure from June 30 through August 31. There was a detour route (see map).
The estimated cost was $750,000 and was paid for through Surface Water Utility funds.
Project Manager, Engineer III
Ph: 425-388-6689
3000 Rockefeller Ave., M/S 303
Everett, WA 98201
Email Surface Water Management Division
Ph: 425-388-3464
Project #RR48907
Construction schedules are subject to change based on many factors that include: public safety; availability of funding, staffing, equipment and materials; right of way issues; permitting requirements; coordination with utilities and other agencies; soil conditions under roadway and seasonal changes.