Snohomish County replaced two culverts under 280th St NE, northwest of Arlington. The pre-existing culverts were deemed fish-passage barriers. The new box culverts are designed to meet fish passage standards.
Construction began in July 2022 and end mid-September.
During construction there were single-lane closures. Emergency services were notified and were able to get through the project area.
This project cost approximately $1.1 million and was funded by Surface Water Management Utility fees.
Project Manager, Engineer III
Ph: 425-388-6689
3000 Rockefeller Ave., M/S 303
Everett, WA 98201
Email Surface Water Management Division
Ph: 425-388-3464
Project #RR48100 and #RR48655
Construction schedules are subject to change based on many factors that include: public safety; availability of funding, staffing, equipment and materials; right of way issues; permitting requirements; coordination with utilities and other agencies; soil conditions under roadway and seasonal changes.