35th Ave SE Corridor, Phase I-180th St SE to 152nd St SE (Seattle Hill Rd)
Description - Completed
Snohomish County completed improvements to the 35th Ave SE corridor between 180th St SE and 152nd St SE (Seattle Hill Road) during June 2019. A ribbon cutting event was held on June 25 at Tambark Creek Park.
The corridor is an important north-south route for Snohomish County residents in a rapidly developing area of the county. The project included adding bike lanes, center turn lanes, planter strips, sidewalks, and stormwater detention and treatment facilities. The project improves traffic flow and helps ease congestion during busy morning and afternoon commutes. The addition of continuous center turn lanes will reduce delays caused by turning vehicles. The plan also included dedicated bike lanes and sidewalks on both sides of the road.
35th Ave SE Corridor – Phase 2 between SR 524 to 180th St SE will be constructed after 35th Ave SE Phase 1 is completed.
Schedule
Construction began June 4, 2018 and was completed during June 2019.
2011-2018: Design, survey, environmental review, right-of-way acquisition
The process of developing road projects takes several years. Many factors must be considered, including: location of homes; public right-of-way; stormwater runoff, drainage and water quality; wetlands and buffers; hilly terrain; sight distance; soils; traffic volumes; accident history; vehicle and pedestrian access; location of utilities; and information that residents provide about the area.
- 2011: Completed surveying the topography of the project area
- 2013: Completed environmental review
- 2015: Right of way purchase completed
- 2018: Construction began in spring
- 2019: Project complete in June 2019
Environmental Review
An environmental review was completed in compliance with the SEPA. An environmental checklist was prepared on July 26, 2013.
A Determination of Non-significance (DNS) and Notice of Land Disturbing Activity (LDA) Permit were issued on July 26, 2013. They are also available for viewing at Snohomish County Public Works during normal business hours:
- Cover Letter
- DNS and Land Disturbing Activity Permit
- Environmental Checklist
- SEPA / LDA Notice: August 4, 2013
- SEPA / LDA Notice Sign Posted: August 2, 2013
Public Comment & Appeal Period
The DNS and LDA 21-day comment and appeal period ended on August 26, 2013. Stephanie Cotton, 425-262-2481, is the contact for the environmental process.
Right-Of-Way
As part of the widening project, Snohomish County completed the purchase of right of way adjacent to the road from property owners along 35th Ave SE. For more information on the right-of-way acquisition process, contact Kurt Lytle at 425-388-6457. The process is also included in the Before we Build Pamphlet.
Public Meetings
Snohomish County Public Works held an open house to discuss the 35th Ave SE - Phase I project on April 25, 2018 at Mill Creek Elementary. Information about the project was available along with project experts to answer questions from the public.
Snohomish County Public Works held a public meeting on February 23, 2017 to discuss three projects in this area. The projects were Seattle Hill Rd, 35th Ave SE, and 156th St SE. Staff was available to answer questions about the construction on Seattle Hill Rd, review proposed road improvements to the section of 35th Ave SE, and gather feedback on potential designs for the 156th St SE project.
Map
Other documents
- 35th Ave SE Reconstruction - City of Mill Creek
- 35th Ave SE, Phase I (180th St SE to Seattle Hill Rd)
- 35th Ave SE, Phase II (SR 524 to 180th St SE)
- 43rd Ave SE/Sunset Rd (SR 524 to 180th St SE)
- 156th St SE (35th Ave SE to the schools)
- 180th St SE, Phase I and II (SR 527 to 35th Ave SE)
- Seattle Hill Rd (35th Ave SE to 132nd St SE)
Contact Us
-
Email the Roads Division
Ph: 425-388-ROAD (7623)
-
Snohomish County Public Works
3000 Rockefeller Ave., M/S 607
Everett, WA 98201
View additional road information.
Project #:
RC1628 - phase one
RC1629 - phase two
Construction schedules are subject to change based on many factors that include: public safety; availability of funding, staffing, equipment and materials; right of way issues; permitting requirements; coordination with utilities and other agencies; soil conditions under roadway and seasonal changes.