2020 Storm Damage Projects
Heavy rains and strong winds caused severe flooding and other storm-related damage throughout Snohomish County in February 2020. Snohomish County Public Works recorded nearly 150 different damage locations across the county from the storm event. Staff have identified 14 damage sites that need further staff support to construct repairs. In some cases, engineering, geotechnical, environmental or archaeological studies are required. Whenever possible, Public Works staff obtain federal funding through a reimbursement process. The following storm damage project sites are currently scheduled for repair. Information will be provided as projects are scheduled and details become available. |
LIST OF PROJECTS
1} 26800 Stanwood-Bryant Rd2} Nicks Rd at MP 0.08 3} Mtn Loop Hwy at Goodman Crk 4} 6725 Rivershore Rd 5} 5001 Riverview Rd 6} 6323 Riverview Rd 7} Thomas Crk Br 642 on Cathcart Way 8} High Br Rd E of 161000 9} 24000 High Br Rd 10} Lake Fontal Rd, E of 21605 11} Woods Crk Rd at Yeager Rd 12} Woods Crk Rd at Wagner Rd 13} 12900/13400 Woods Crk Rd 14} 14100 Kellogg Lake Rd |
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
1} 26800 Stanwood-Bryant Rd – Arlington (Completed August 2020)
Shoulder Damage
Pavement Cracking, Embankment Movement
Culvert, Embankment, Subgrade Damage
Embankment/Dike Repair
Embankment/Dike Repair
Embankment/Dike Repair
Embankment Erosion Under Bridge at West Abutment
Slide, Ditch/Road/Guardrail Damage
Guardrail Damage, Road Shifting
Guardrail/Shoulder Damage
Slide, Embankment and Shoulder Damage
Slope Drain, Embankment Damages
Shoulder, Road Damage, Slide
Cracks in Asphalt
Shoulder Damage
- Contacts: Mary Auld, Environmental Planner (425-262-2460); Nolan Anderson, Project Manager (425-262-2643)
Pavement Cracking, Embankment Movement
- Contact: Dale Topham, Geotechnical Supervisor (425-388-6668); Mike Randall, Project Manager (425-388-6642)
Culvert, Embankment, Subgrade Damage
- Temporary repairs performed in 2020.
- Completed a type, size and location study in 2021. The proposed permanent repair will replace the culvert with a bridge.
- Engineering and environmental planning are currently underway in 2022 and 2023.
- View details on project webpage
Embankment/Dike Repair
- Contacts: Stephanie Cotton, Environmental Planner (425-262-2481); Mike Randall, Project Manager (425-388-6642)
- View details on webpage
Embankment/Dike Repair
- Contacts: Stephanie Cotton, Environmental Planner (425-262-2481); Nolan Anderson, Project Manager (425-262-2643)
Embankment/Dike Repair
- Contacts: Stephanie Cotton, Environmental Planner (425-262-2481); Mike Randall, Project Manager (425-388-6642)
- View details on webpage
Embankment Erosion Under Bridge at West Abutment
- View project description/map/postcard (PDF)
- Contacts: Troy Fields, Environmental Planner (425-388-6430); Larry Brewer, Project Manager (425-262-2733)
- Documents:
- Critical Areas Regulations (CAR) Memo (PDF)
- Design Memo (PDF)
- SEPA Review Memo (PDF)
Slide, Ditch/Road/Guardrail Damage
- Contacts: Troy Fields, Environmental Planner (425-388-6430); Nolan Anderson, Project Manager (425-262-2643)
Guardrail Damage, Road Shifting
- Contacts: Troy Fields, Environmental Planner (425-388-6430); Nolan Anderson, Project Manager (425-262-2643)
Guardrail/Shoulder Damage
- Contacts: Troy Fields, Environmental Planner (425-388-6430); Nolan Anderson, Project Manager (425-262-2643)
Slide, Embankment and Shoulder Damage
- Contacts: Stephanie Cotton, Environmental Planner (425-262-2481); Matt Feeley, Project Manager (425-262-2637)
- Continue to monitor embankment.
Slope Drain, Embankment Damages
- Contacts: Stephanie Cotton, Environmental Planner (425-262-2481); Nolan Anderson, Project Manager (425-262-2643)
Shoulder, Road Damage, Slide
- Contacts: Stephanie Cotton, Environmental Planner (425-262-2481); Nolan Anderson, Project Manager (425-262-2643)
Cracks in Asphalt
- Contacts: Troy Fields, Environmental Planner (425-388-6430); Dale Topham, Geotechnical Supervisor (425-388-6668)
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download
Contact Us
-
Email the Roads Division
Ph: 425-388-ROAD (7623)
-
Snohomish County Public Works
3000 Rockefeller Ave., M/S 607
Everett, WA 98201
Current Road Projects
View a list of current road projects.
Completed Road Projects
View a list of completed road projects.
Construction schedules are subject to change based on many factors that include: public safety; availability of funding, staffing, equipment and materials; right of way issues; permitting requirements; coordination with utilities and other agencies; soil conditions under roadway and seasonal changes.