35th Ave SE & 180th St SE Intersection

Completed June 2013

Final paving, striping, and sidewalk details are finished; and the new signal is in operation.

Project Description

A right turn lane was added to all legs of the intersection, along with curbs, gutters, sidewalks, planter strips, and a new traffic signal.

Construction began in 2012. The new configuration provides a left-turn lane, a right-turn lane and a through lane at each approach to the intersection.