Monitoring

This Snohomish Estuary Monitoring Project was funded by NOAA Coastal Resiliency grant awards and was administered by Washington Department of Fish and Wildlife as an Estuary and Salmon Restoration Program (ESRP) Learning Project. 

Final Environmental Impact Statement (FEIS)

The county issued a FEIS on December 12, 2013, to analyze the environmental impacts of the proposal.

  • Postcard Notice (PDF)
  • Sign Posted on the Site (PDF)
  • Notice of Availability (PDF) - Everett Herald Publication
  • FEIS Parts
    • Full FEIS (PDF)
    • Appendix A (PDF): Snohomish County Council Resolution No. 05-026
    • Appendix B (PDF): Agricultural Advisory Board Recommendation
    • Appendix C (PDF): Salmon Productivity Calculations for Smith Island Restoration Project
    • Appendix D (PDF): Current and Future Bird Use of the Project Area
    • Appendix E (PDF): Current and Future Wildlife Use of the Project Area
    • Appendix F (PDF): FEIS Distribution List
    • Appendix G (PDF): Draft Environmental Impact Statement (DEIS) Comment Letters and County’s Responses
    • Appendix H (PDF): SNR Company Review of Smith Island Estuary Restoration Project – Tasks 1-4 Report – and Snohomish County Responses to their Comments
    • Appendix I (PDF): Snohomish County Smith Island Drainage Analysis, May 2013
    • Appendix J (PDF): Snohomish County Smith Island Estuarine Restoration Union Slough Hydraulic Model Study, May 2013
    • Appendix K (PDF): Snohomish County Smith Island Estuarine Restoration Saltwater Impact Study, May 2013
    • Appendix L (PDF): Snohomish County Smith Island Estuary Restoration Interior Drainage Report Preliminary 60 Percent Design, November 2013
    • Appendix M (PDF): Preliminary Haul Route Recommendation for Snohomish County Smith Island Estuary Restoration Project, October 4, 2013
    • Appendix N (PDF): Preliminary Setback Levee Erosion Protection Recommendations for Snohomish County Smith Island Estuary Restoration Project, October 10, 2013
    • Appendix O (PDF): Preliminary Levee Breach and Ditch Fill Recommendations for Snohomish County Smith Island Estuary Restoration Project, October 4, 2013
    • Appendix P (PDF): Final Geotechnical Engineering Report for Snohomish County Smith Island Estuary Restoration Project, March 25, 2015

Additional Documents